Kinetic Green Energy and Power Solutions Limited v. Saera Electric Auto Limited

Civil Appeal · 2026 INSC 1057Decided 24 Sept 2026
Civil Appeal No. 13117 of 2026 (arising out of SLP(C) No. 31162 of 2026)
Justice Aravind Kumar · Justice Vipul M. Pancholi

Background

Kinetic Green and Saera Electric Auto had entered into manufacturing, supply-distribution and IP agreements under which Saera was to exclusively manufacture vehicles for Kinetic, with non-compete obligations. A dispute arose after Saera began manufacturing and selling its own "Mayuri" branded three-wheelers, which Kinetic said breached the exclusivity clause. Kinetic obtained an interim injunction from the Commercial Court restraining Saera from making or selling the Mayuri vehicles and from launching new products, but on Saera's appeal, the High Court of Karnataka stayed that injunction, finding that the joint venture had never really "taken off" and that Saera had been selling some of these vehicles since 2023.

Decision Breakdown

At the hearing before the Supreme Court, both sides agreed to resolve their dispute through arbitration and jointly proposed Justice R.V. Raveendran (a former Supreme Court judge) as sole arbitrator instead of the three-member tribunal originally contemplated. The Court appointed him as sole arbitrator, set aside/modified both the Commercial Court's and the High Court's orders, and directed that Saera would not manufacture or launch the specific vehicles described in the agreement (modifying the High Court's broader restriction) until the arbitrator decides any interim-relief application filed under Section 17 of the Arbitration Act. The Court made clear the arbitrator should decide that application uninfluenced by the observations in the lower court orders.

Lesson Learnt

When commercial parties in an arbitration-bound contract are willing to agree on a sole arbitrator, courts will readily facilitate that agreement and let the arbitral tribunal itself take over interim relief, rather than continuing to litigate stay applications through multiple court levels.

Arbitration & Commercial LawSupreme Court of India

Shreeram Builders v. Upendra Kantilal Thanawala & Ors.

The Supreme Court upheld setting aside the award, though for more precise reasons, holding that stamp duty classification alone wasn't decisive, but the arbitrators had exceeded their authority by effectively rewriting the contract: the price was never fixed, full consideration was never paid by deadline, and the arbitrators invented an unexplained price multiplier and damages the contract never provided for. Invoking its Article 142 power to do complete justice, the Court ordered the owners to refund all amounts received from the builder with 9% interest, since they never returned the payments after terminating the deal.

Decided 29 Oct 2026Read case
Arbitration & Commercial LawDelhi High Court

M/S S.R. Ashok & Associates vs. Delhi Development Authority & Anr. and connected matters

The Court rejected the time-bar argument since the arbitration invocation was a single continuing one and DDA had consented to delays while participating throughout. It found no error apparent on the face of either award, upholding both and making them enforceable court decrees.

Decided 28 Oct 2026Read case
Arbitration & Commercial LawDelhi High Court

Axis Finance Ltd vs. Mr Nikhil A V & Ors.

The Court granted leave and liberty to withdraw and dismissed the petition without ruling on the underlying dispute.

Decided 28 Oct 2026Read case
Arbitration & Commercial LawDelhi High Court

MMTC Limited vs. Aust Grain Exports Pty Ltd

The Court rejected MMTC's procedural and compensation arguments but found one real flaw: the tribunal had expressly rejected the exporter's claim for interest on the refunded guarantee (since the contract barred it), yet then awarded that very interest anyway, a direct, unexplained contradiction. The Court struck out only that contradictory portion as severable, leaving the rest of the award intact.

Decided 28 Oct 2026Read case
Arbitration & Commercial LawDelhi High Court

Chief Electoral Officer & Anr. vs. M/S Mahlakshmi Light House

The government argued the arbitrator ignored an internal inquiry suggesting inflated bills. The Court held returning officers who checked goods at the time gave more reliable evidence than a later inquiry report, and this specific objection was never raised before the single judge, so couldn't be raised for the first time on appeal. The appeal was dismissed.

Decided 28 Oct 2026Read case
Arbitration & Commercial LawDelhi High Court

Utracon Corporation Pte Ltd vs. Ucon PT Structural System Private Limited (formerly Utracon Structural Systems Private Limited) & Ors.

The defendant applied to refer the whole suit to arbitration, arguing the real dispute was about contractual rights to use the marks between identified parties (not a trademark registration or grant dispute, which can't be arbitrated), flowing from a single composite transaction. The Court agreed: the arbitration clause's existence was undisputed, the dispute was essentially contractual, and since the plaintiff itself had pleaded that the other defendants formed a "single economic unit" with the main defendant and derived their rights "through" it, their claims couldn't be separated out either; any question of whether they were bound by the arbitration clause was for the arbitrator to decide. The Court referred the whole suit to arbitration and disposed of it, expressly offering no opinion on the merits.

Decided 28 Oct 2026Read case