Background

This long-running writ petition under Article 32, along with a connected civil appeal and another writ petition, concerned protection of the critically endangered Great Indian Bustard (locally called "Godawan"), whose population has collapsed largely due to fatal collisions with overhead high-tension power transmission lines built for solar and wind energy projects in Rajasthan and Gujarat. Earlier in the case, in 2021 the Court had passed a sweeping interim order effectively requiring undergrounding of power lines across a huge "priority area," which renewable energy generators said was technically and economically unworkable at that scale; in 2024 the Court had constituted an Expert Committee to study the issue and recommend a balanced, scientifically grounded solution.

Decision Breakdown

Having received and considered the Expert Committee's detailed reports (and objections from renewable energy generators, petitioners, and other stakeholders), the Court replaced the blanket undergrounding mandate with a calibrated, area-specific scheme: it accepted the Committee's revised, science-based demarcation of "Priority Areas" in Rajasthan and Gujarat, directed mandatory undergrounding of specified categories of power lines (e.g., certain voltage lines and ~250 km of critical lines identified by the Wildlife Institute of India) within a strict two-year timeline, ordered rerouting and optimisation of transmission corridors to share common alignments and minimise new bird-strike risk, and left other lines to bird-flight-diverter (BFD) mitigation based on further scientific study. It also directed that corporate environmental responsibility be factored into future planning. With these detailed, phased directions, the writ petitions and the civil appeal were disposed of.

Lesson Learnt

Courts increasingly resolve conflicts between environmental/wildlife protection and infrastructure development not through blanket, one-size-fits-all bans but through expert-committee-driven, time-bound, geographically calibrated compromises, and citizens/petitioners can use Article 32 public interest litigation to compel the state and private developers to build in scientifically justified environmental safeguards even for projects (like renewable energy) that are otherwise in the public interest.

Environmental LawDelhi High Court

Pradeep Kumar Gupta vs. Delhi Development Authority

The Division Bench dismissed the appeal. It held that unauthorised parking itself is a misuse of the regulated floodplain, regardless of whether any dumping occurred. The Rs 5,000 compensation under the NGT's para 94(vi)(d) relates to throwing pooja or other material into the river, not to parking, so it did not apply. The lack of parking space due to renovation did not justify parking in a prohibited, environmentally sensitive area. The appellant had been given a personal hearing on its representation before the rejection order, so the no-hearing complaint also failed.

Decided 1 Oct 2026Read case
Environmental LawDelhi High Court

M/s Carnival Greens vs. Delhi Pollution Control Committee & Ors.

This was a very short, procedural order. The DPCC's counsel confirmed to the Court, on instructions, that only a show-cause notice had been issued so far and that the petitioner would be given a personal hearing before the DPCC decided anything. On the strength of this assurance being placed on record, the Court disposed of the writ petition without deciding any of the substantive issues raised (about infrastructure gaps or a provisional consent), since the DPCC had committed to hearing the petitioner out first.

Decided 18 Sept 2026Read case
Environmental LawDelhi High Court

M/S Ambria Cafe vs. Delhi Pollution Control Committee (DPCC) & Ors.

Notice was issued in the petition, and counsel for DPCC accepted notice on its behalf. DPCC's counsel clarified, on instructions, that only a show cause notice (not a final closure/compensation order) had been issued, and assured the Court that the petitioner would be given a personal hearing before any final decision was taken. Taking this statement on record, the Court disposed of the writ petition without deciding the underlying merits.

Decided 18 Sept 2026Read case
Environmental LawSupreme Court of India

M/S Punahchakran Private Limited v. Indotech Waste Solution

The Supreme Court held that the CPCB's 2016 revised guidelines for bio-medical waste facilities are mandatory and binding even though never published in the Official Gazette, since publication on the CPCB's official website was a reasonably sufficient mode of notice for such technical guidelines. However, the Court found that Punahchakran's relaxation from the standard 1-acre land requirement was validly granted: its facility was in a rural area (a permitted ground for relaxation) and the CPCB had been properly consulted and had imposed additional safeguard conditions. The Court also clarified that land allotment is not a strict legal precondition for starting the environmental-clearance application process, and that the original 2021 Terms of Reference remained valid (having a four-year validity period) even though the first EC based on it was earlier quashed, so the second EC could validly rely on that same original study. Concluding that the NGT had erred in quashing the second EC and CTE, the Supreme Court set aside the NGT's judgment and restored Punahchakran's approvals.

Decided 7 Sept 2026Read case
Environmental LawSupreme Court of India

Fisherman Care v. Government of India, Department of Animal Husbandry, Dairying and Fisheries

The Supreme Court held there is no real conflict between the Centre's power to regulate fishing in the EEZ (under Entry 57 of List I, exercised via the new EEZ Rules, 2025) and the State's power to regulate fishing within its territorial waters (under Entry 21 of List II, via the Tamil Nadu Marine Fishing Regulation Rules): these are two co-equal, autonomous legislative spheres that must operate together through "cooperative federalism." Following the Expert Committee's recommendations (that an outright ban on purse seine nets isn't justified but effective regulation is needed), the Union had already notified the EEZ Rules, 2025 creating an "Access Pass" system for vessels to transit through State waters into the EEZ. However, the Court found the on-ground implementation deeply flawed: of 257 access-pass applications, 226 were stuck pending verification by Tamil Nadu authorities, with only 6 passes actually issued, the lowest among all coastal States, which the Court said effectively amounted to an unwritten, unlawful ban. The Court directed Tamil Nadu to process applications efficiently and to frame rules designating a specific transit channel through its territorial waters for vessels headed to the EEZ, and disposed of the application on this basis.

Decided 2 Sept 2026Read case
Environmental LawSupreme Court of India

In Re: 2 Million Lives at Risk, Contamination in Jojari River, Rajasthan

Reviewing the SIT's report and the State's compliance report, the Court found continuing systemic failures, including that the State's report was silent on any action taken against responsible Rajasthan State Pollution Control Board officers, and issued a fresh set of detailed directions. These included: a scientific determination and demarcation of the High Flood Line and ecological buffer for the river system before any further industrial development (specifically flagging the proposed RIICO Industrial Area, Kakani, and the Ambey Valley Industrial Park as built too close to the river); an inquiry by the Chief Secretary into irregularities in land-use conversion and plot allotments at Ambey Valley; a comprehensive groundwater management strategy with a ban on new water-intensive industries in over-exploited "dark zones"; expedited transfer of identified lands to the Forest Department for ecological restoration; and a survey-and-removal drive against encroachments and illegal mining on riverbeds and floodplains. The Court also directed that action taken against RSPCB officers be reported within three days and listed the matter for further hearing on 22 September 2026, while noting that industrial pollution issues in Jaipur would be taken up separately once the present remedial framework is substantially implemented.

Decided 7 Aug 2026Read case