Samaj Parivartana Samudaya and Ors. vs State of Karnataka and Ors.

Writ Petition (Civil) · 2022 INSC 873Decided 26 Aug 2022
Writ Petition (Civil) No. 562 of 2009
N.V. Ramana · Hima Kohli · C.T. Ravikumar

Background

This is a long-running PIL (filed in 2009) through which the Supreme Court has, over more than a decade, supervised the regulation of iron-ore mining in Bellary, Chitradurga and Tumkur districts of Karnataka after finding rampant illegal mining causing serious environmental damage. The Court had earlier imposed a "ceiling limit" (a cap) on total annual iron-ore production in these districts: 25 MMT (million metric tonnes) for Bellary and 5 MMT for Chitradurga/Tumkur in 2012, later raised to 28 MMT and 7 MMT respectively in 2017. By 2022, with illegal mining curbed and Reclamation & Rehabilitation Plans in place for individual mines, mining lease-holders, the State of Karnataka, the Ministry of Steel and the Centrally Empowered Committee (CEC) all sought a complete removal of the ceiling limit; only the original petitioner (through advocate Prashant Bhushan) opposed any relaxation, citing the risk of over-exploitation and intergenerational equity.

Decision Breakdown

The Court noted that circumstances had materially changed since the ceiling was first imposed: illegal mining had been controlled, scientific Maximum Permissible Annual Production limits now exist for each mine, and even the CEC (which had earlier recommended the caps) now supported lifting them. However, the Court-appointed Oversight Authority could not give a firm opinion because of conflicting views between the CEC and the Monitoring Committee over whether transport/road infrastructure could handle increased output. Balancing the case for growth against the petitioner's environmental concerns and the principle of sustainable development, the Court declined to remove the ceiling entirely as the CEC recommended, opting instead for a calibrated increase: from 28 MMT to 35 MMT for Bellary district, and from 7 MMT to 15 MMT for Chitradurga and Tumkur districts collectively. Three of the four pending applications were disposed of on these terms; one application concerning enhancement procedures for individual mines was left for a future hearing.

Lesson Learnt

In long-running environmental supervisory litigation, courts recalibrate earlier restrictions gradually as ground realities improve, favouring a cautious, incremental relaxation over an all-or-nothing removal, balancing economic activity against ecological safeguards and the interests of future generations.

Environmental LawDelhi High Court

Pradeep Kumar Gupta vs. Delhi Development Authority

The Division Bench dismissed the appeal. It held that unauthorised parking itself is a misuse of the regulated floodplain, regardless of whether any dumping occurred. The Rs 5,000 compensation under the NGT's para 94(vi)(d) relates to throwing pooja or other material into the river, not to parking, so it did not apply. The lack of parking space due to renovation did not justify parking in a prohibited, environmentally sensitive area. The appellant had been given a personal hearing on its representation before the rejection order, so the no-hearing complaint also failed.

Decided 1 Oct 2026Read case
Environmental LawDelhi High Court

M/s Carnival Greens vs. Delhi Pollution Control Committee & Ors.

This was a very short, procedural order. The DPCC's counsel confirmed to the Court, on instructions, that only a show-cause notice had been issued so far and that the petitioner would be given a personal hearing before the DPCC decided anything. On the strength of this assurance being placed on record, the Court disposed of the writ petition without deciding any of the substantive issues raised (about infrastructure gaps or a provisional consent), since the DPCC had committed to hearing the petitioner out first.

Decided 18 Sept 2026Read case
Environmental LawDelhi High Court

M/S Ambria Cafe vs. Delhi Pollution Control Committee (DPCC) & Ors.

Notice was issued in the petition, and counsel for DPCC accepted notice on its behalf. DPCC's counsel clarified, on instructions, that only a show cause notice (not a final closure/compensation order) had been issued, and assured the Court that the petitioner would be given a personal hearing before any final decision was taken. Taking this statement on record, the Court disposed of the writ petition without deciding the underlying merits.

Decided 18 Sept 2026Read case
Environmental LawSupreme Court of India

M/S Punahchakran Private Limited v. Indotech Waste Solution

The Supreme Court held that the CPCB's 2016 revised guidelines for bio-medical waste facilities are mandatory and binding even though never published in the Official Gazette, since publication on the CPCB's official website was a reasonably sufficient mode of notice for such technical guidelines. However, the Court found that Punahchakran's relaxation from the standard 1-acre land requirement was validly granted: its facility was in a rural area (a permitted ground for relaxation) and the CPCB had been properly consulted and had imposed additional safeguard conditions. The Court also clarified that land allotment is not a strict legal precondition for starting the environmental-clearance application process, and that the original 2021 Terms of Reference remained valid (having a four-year validity period) even though the first EC based on it was earlier quashed, so the second EC could validly rely on that same original study. Concluding that the NGT had erred in quashing the second EC and CTE, the Supreme Court set aside the NGT's judgment and restored Punahchakran's approvals.

Decided 7 Sept 2026Read case
Environmental LawSupreme Court of India

Fisherman Care v. Government of India, Department of Animal Husbandry, Dairying and Fisheries

The Supreme Court held there is no real conflict between the Centre's power to regulate fishing in the EEZ (under Entry 57 of List I, exercised via the new EEZ Rules, 2025) and the State's power to regulate fishing within its territorial waters (under Entry 21 of List II, via the Tamil Nadu Marine Fishing Regulation Rules): these are two co-equal, autonomous legislative spheres that must operate together through "cooperative federalism." Following the Expert Committee's recommendations (that an outright ban on purse seine nets isn't justified but effective regulation is needed), the Union had already notified the EEZ Rules, 2025 creating an "Access Pass" system for vessels to transit through State waters into the EEZ. However, the Court found the on-ground implementation deeply flawed: of 257 access-pass applications, 226 were stuck pending verification by Tamil Nadu authorities, with only 6 passes actually issued, the lowest among all coastal States, which the Court said effectively amounted to an unwritten, unlawful ban. The Court directed Tamil Nadu to process applications efficiently and to frame rules designating a specific transit channel through its territorial waters for vessels headed to the EEZ, and disposed of the application on this basis.

Decided 2 Sept 2026Read case
Environmental LawSupreme Court of India

In Re: 2 Million Lives at Risk, Contamination in Jojari River, Rajasthan

Reviewing the SIT's report and the State's compliance report, the Court found continuing systemic failures, including that the State's report was silent on any action taken against responsible Rajasthan State Pollution Control Board officers, and issued a fresh set of detailed directions. These included: a scientific determination and demarcation of the High Flood Line and ecological buffer for the river system before any further industrial development (specifically flagging the proposed RIICO Industrial Area, Kakani, and the Ambey Valley Industrial Park as built too close to the river); an inquiry by the Chief Secretary into irregularities in land-use conversion and plot allotments at Ambey Valley; a comprehensive groundwater management strategy with a ban on new water-intensive industries in over-exploited "dark zones"; expedited transfer of identified lands to the Forest Department for ecological restoration; and a survey-and-removal drive against encroachments and illegal mining on riverbeds and floodplains. The Court also directed that action taken against RSPCB officers be reported within three days and listed the matter for further hearing on 22 September 2026, while noting that industrial pollution issues in Jaipur would be taken up separately once the present remedial framework is substantially implemented.

Decided 7 Aug 2026Read case