Haryana Power Purchase Centre v. Magnum Power Gen.Ltd.
Background
Magnum Power Generation had a 1998 power purchase agreement with the Haryana Electricity Board (now represented by the Haryana Power Purchase Centre, "HPPC") to supply electricity from its plant. A 2003 state tariff order effectively stopped the Board from drawing any power from Magnum's plant (as too costly for consumers) while also recognising Magnum's entitlement to be paid a "fixed cost" regardless of whether power was actually purchased from it. When Magnum sought payment of these fixed costs, the state regulator and the Electricity Appellate Tribunal ruled against it for not having actually supplied the contractually required minimum output. Separately, in the connected appeals carrying this very diary number (Civil Appeal Nos. 4407-4408 of 2011), HPPC's own appeal to the Appellate Tribunal had earlier been dismissed because a 327-day delay in filing was not condoned.
Decision Breakdown
In the lead, connected appeals (Civil Appeal Nos. 7446-7447 of 2012), the Supreme Court held that the 2003 tariff order had already settled that fixed costs must be paid to Magnum regardless of actual power drawn, since the Board itself had chosen not to draw the power in consumers' interest, and the Board had in fact already collected these fixed costs from consumers without passing them on to Magnum. The Court set aside the lower rulings and directed the Board to pay the demanded fixed costs with interest. As for HPPC's own appeals bearing this diary number (Civil Appeal Nos. 4407-4408 of 2011), the Court held that nothing survived in them once the lead appeals were decided in Magnum's favour, and disposed of them on that basis, alongside noting that the Tribunal's refusal to condone HPPC's 327-day delay stood unchallenged.
Lesson Learnt
When a regulator stops a supplier from delivering a contracted service in the larger public interest, the supplier can still be entitled to its guaranteed fixed costs under the contract; and an appeal that depends entirely on a related, separately-decided matter can be finally disposed of as infructuous once that related matter is resolved.